A clean estimate with a plain-English summary, a line-item table, what's not included, and how to approve.
An electrician quoted a new build at $16,000 in his head, then $16,500 itemized. What would AI save him?
A skeptic's view: entering everything into the AI is the same work as writing the quote.
What they did
In a r/electricians thread on what could go wrong with AI estimating and invoicing, one electrician said he had just verbally quoted a new home build at $16,000 after looking at the drawings, then wrote an itemized estimate that came to $16,500.
How it went
His point: "putting all the info into the AI is basically the work it takes to make up the quote, if you have some experience." Others said in low voltage, salespeople's AI scopes have been "about as abysmal as you could expect." A few suggested using AI as a second opinion: if it comes out much higher, maybe you missed something. One said a couple of tools were fine for quick ballparks.
Worth knowing
For experienced estimators, the win isn't the number. It's the write-up, the follow-up and catching what you missed. Use AI as a cross-check, not the estimator.
Try it yourself
Want help getting this working? Rise Systems in Oconomowoc sets these up.
Source: Reddit r/electricians · 2025 (see post)
Quotes that took him an hour per 10 now come out with datasheets in about 15 minutes.
AI is weakest reading dense drawings as images. Pull out the notes and schedules as text first.
It got there only because he gave it every variable. Others report about 70% accuracy on AI takeoffs.
One uses an estimating tool with built-in AI takeoff that saves him hours, but warns never to replace estimator instincts.